14 Years Manufacturer melamine two tone cups to Nepal Manufacturers
14 Years Manufacturer melamine two tone cups to Nepal Manufacturers Detail:
| Specification | |
| Item Name | 380ml Melamine Two Tone Cups | 
| Item No. | CP007 | 
| Shape | Round | 
| Body Color | Coloful | 
| Decal Color | 4 colors print (if need) | 
| Finish | Glossy | 
| Style | Fashion | 
| Motif Design | Customized | 
| Shape Design | OEM/ODM | 
| Test Standard | FDA,PROP 65,EN71,LFGB etc. by SGS or ITS | 
| Packaging | 6pcs/box,72pcs/carton | 
| Dimensions | |
| Length | 9 cm | 
| Width | 9 cm | 
| Height | 9.2 cm | 
| Capacity | 380 ml | 
| Material | |
| Body Material | 100%melamine | 
| Decal Material (if need) | 4 colors print (CMYK), or spot color printing, RoHS certificate | 
| Imprint (if need) | Seiko ink type 1000 or other type, RoHS certificate | 
| Accessories Information | |
| Lid included | No | 
| Other | No | 
| Weights | |
| Net Weight (kg) | 7 | 
| Shipping Weight (kg) | 8.2 | 
Product detail pictures:



Related Product Guide:
Affordable Types of Dinnerware Sets
Benefits of Melamine Dinnerware
It can be our accountability to satisfy your preferences and competently provide you. Your satisfaction is our greatest reward. We are searching ahead towards your visit for joint growth for 14 Years Manufacturer melamine two tone cups to Nepal Manufacturers, The product will supply to all over the world, such as: Senegal , Gambia , Finland , With more and more Chinese products around the world, our international business is developing rapidly and economic indicators big increase year by year. We have enough confidence to offer you both better products and service, because we are more and more powerful, professional and experience in domestic and international.
FAQ: 1.Q: Where is your factory located? How can I visit there? A: Our factory is located in Guangdong province, China. Warmly welcome to visit us! 2.Q: What is the material of your products? A: The material is melamine.  3.Q: How can I get some samples? A: We can send the samples by Express/DHL/FedEx/UPS etc. 4.Q: How does your company do regarding quality control? A: We have a very strict QC system. Our inspectors have been closely monitoring the production process from the selection of raw materials to the final step of the finished products. 5.Q: Can you print our logo on the product & packing? A: Yes, We can print your logo on our products. 
| * Do Not Touch On Fire Directly | |
|---|---|
| * Do Not Washing By Steelwire Ball | |
| * Non-Microwave Ovens | |
| * Dishwasher Safe | 
I had trouble finding any videos on how to fill the cracks in old style paneling. We had a dark wood type of paneling downstairs and I HATE wood paneling….now REAL wood paneling I can deal with but not the fake wood paneling. You find this a lot in older homes. In our case this house had survived a flood in the 80s so the previous owners replaced the downstairs walls with paneling while almost all of the upstairs has plaster. I hope you find this video helpful! 
Here is a link to some before/after photos:
http://jenniferlynnamie.com/blog/2012/our-home-before-after/
Here is a link to my after video:
Materials needed:
Ladder (may not need if you have low ceilings and are tall)
Bucket of drywall compound/putty (5gal)
Putty knife and Tray
Sandpaper
Primer
Paint 
Steps:
Sand glossy paneling to give drywall a rough texture to stick to.
Coat putty in cracks and run putty knife over to smooth out.
Lightly sand rough edges after it is dry.
Apply second coat of putty in the cracks.
Sand again.
Repeat a third time if desired.
Apply thin coat of primer.
Apply two coats of desired paint color  
 
—————————————————
It took us 4-5 days of work. I was there 24/7 from the time we close but my hisband only had the first and third day off. We also had some help from friends. Here is a timeline breakdown: (ea night we were up to anywhere from midnight – 2am and I’d wake up next morning around 7/8am and continue work.)
June 19- closed on house.
4pm-? Sanded walls, started filling with putty, two rms completed.
Total of 4 people working most of time
June. 20 – Sanded down, 2nd coat drywall putty in cracks.
2 people working at a time.
June 21. – moved stuff from storage to garage so didnt work until afternoon/evening.
Painted primer on trim and walls both rooms.
3 people working most of time.
June 22. – Painted trim and 1st coat on walls
1 person most of time, 2 after husband got off work.
June 23rd – 2nd and final coat of paint trim and walls.
2 people working throughout day.
It was a lot of work! But i would do it over again because i loved how it turned out! Way cheaper than tearing out and replacing with drywall, puttying and painting drywall,
 By Gloria
 from Amsterdam
 - 2016.09.30 16:36
 By Gloria
 from Amsterdam
 - 2016.09.30 16:36
				 Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
 By Freda
 from Latvia
 - 2015.06.18 17:25
 By Freda
 from Latvia
 - 2015.06.18 17:25
				 










